ABOUT DYNEX | CAREERS | NEWS | CONTACT US | Call. 01522 500 500
Main Switchboard:
t. +44 (0)1522 500 500
Careers About Us Contact Us Distributors
Keep informed of new and existing product offerings, company updates, exhibition attendance and job vacancies.
Sign Up Now
Dynex were thrilled to be a part of the Brush Traction refurbishment project of class 92 locomotives.
Our program of work on the GTO clamped assemblies consisted of the following; a full disassembly of the clamps, a thorough clean of all components and the removal of excess oil debris, disposal of the original semiconductor devices and the replacement with modern-day equivalents, oil replacement and final assembly testing using our in-house dedicated test equipment before returning to Brush Traction for operational use.
In supporting the Brush Traction refurbishment project, we were able to provide obsolescence management for this mature fleet, ensuring long-term UK based support for spares and maintenance for the class of 92 locomotive. The vehicles were returned to service powering the Caledonian sleeper from London to Edinburgh, as well as on freight operations.
The full overhaul and reinstatement of this power unit is the last in a series of successful programs of work performed at Dynex, providing power semiconductor mid-life refurbishment for reliability improvement and preventative maintenance.
Download the traction overhaul leaflet here.
Back To News